Crafting

Book of Management · Research Table

Used to pass down and study management, improving residents’ management capability (written by Scholars at the Research Table, taken and studied by Nobles, storage location unrestricted)

Base values & conditions

Output per batch
1
Base production (days)
60
Education output bonus
0
Requires recipe research
Yes

Material

Production calculator

1 batches

Base output 1
Serial base duration 60 days

Rounds up to whole batches. Time excludes efficiency, transport, waiting and parallel production.

Product

Production facility

Based on this project’s current base configuration. Difficulty, education, equipment, skills, save state and mods can change actual results.