Crafting
Book of Management · Research Table
Used to pass down and study management, improving residents’ management capability (written by Scholars at the Research Table, taken and studied by Nobles, storage location unrestricted)
Base values & conditions
- Output per batch
- 1
- Base production (days)
- 60
- Education output bonus
- 0
- Requires recipe research
- Yes
Material
Production calculator
1 batches
Base output 1
Serial base duration 60 days
Rounds up to whole batches. Time excludes efficiency, transport, waiting and parallel production.
Product
Production facility
Based on this project’s current base configuration. Difficulty, education, equipment, skills, save state and mods can change actual results.
