Production

Lobster · Crab Trap

A meat product, obtained from lobster traps

Base values & conditions

Output per batch
8
Base production (days)
6
Education output bonus
1
Requires recipe research
No

Production calculator

1 batches

Base output 8
Serial base duration 6 days

Rounds up to whole batches. Time excludes efficiency, transport, waiting and parallel production.

Product

Production facility

Based on this project’s current base configuration. Difficulty, education, equipment, skills, save state and mods can change actual results.